Well, the bathroom is nearly done (see the before and after pix), and I managed to not cut off my ring finger. So, Saturday Mary Kay and I will be getting hitched, in the house, with my two year old granddaughter Morah as the flower girl. Just our kids, a catered dinner, and a lot of dancing and fooling around. Life is good!
Sorry for the belated post. I hope all of you had a very Merry Christmas, and are enjoying your time with family and friends. All the best!
Dan
Re: A Belated Merry Christmas
Posted: Sat Dec 28, 2013 10:28 pm
by rogerh
At first glance, it looks to me like a well-planned and executed remodel! Hope this applies to the ceremonies as well!
Re: A Belated Merry Christmas
Posted: Sun Dec 29, 2013 10:59 am
by Faulkner
rogerh wrote:At first glance, it looks to me like a well-planned and executed remodel! Hope this applies to the ceremonies as well!
Thanks, Roger! The wedding was a "remodel", but not the bathroom! There never was a bathroom there before. My good fortune, that the builders in 1920 left a soil pipe flange under the floor for some future installation.
Dan
Re: A Belated Merry Christmas
Posted: Sun Dec 29, 2013 1:03 pm
by rogerh
piqued my curiosity..what was this room previously? Closet with window?
Was the job inspected? I wouldn't have thought a close 90 elbow on shower line was allowable...
Re: A Belated Merry Christmas
Posted: Mon Dec 30, 2013 11:39 pm
by Denver 59 Fin Convert
Faulkner wrote:
rogerh wrote:At first glance, it looks to me like a well-planned and executed remodel! Hope this applies to the ceremonies as well!
Thanks, Roger! The wedding was a "remodel", but not the bathroom! There never was a bathroom there before. My good fortune, that the builders in 1920 left a soil pipe flange under the floor for some future installation.
Dan
Dan, Now how did you find this hidden soil flange? Were you going to put one in and discovered it by accident? Inquiring minds wants to Know!!! And it all looks like plastic plumbing anyhow...
John Q.
Re: A Belated Merry Christmas
Posted: Mon Dec 30, 2013 11:59 pm
by rogerh
The cast iron "branch" fitting can be seen in the far rear corner...the white PVC is coupled to it. I want to know what this room was before it became a bathroom.
As for finding the drain, he may have planned the bathroom, knowing the cast-iron was nearby, cut open the floor preparing to direct the drain downstairs for connecting, when they uncovered just what they needed..serendipidous (sp), for sure!
Re: A Belated Merry Christmas
Posted: Tue Dec 31, 2013 8:41 am
by Faulkner
Yes, it was a little room between two bedrooms on the third floor, above a bathroom on the second floor. The previous owners used it as a closet, and when Emily lived here for a year, she used it as her art studio.
I expected to find the stack in the wall, and that we would have to cut into it and use a saddle - but, the builders made an accommodation for some future build. Serendipitous, for sure!
My plumber brother cut a cast iron stub, packed it into the flange with oakum, melted lead and poured it into the gap with a special form. Then we made up to the stub with a neoprene coupling, and it was PVC from there on out (except for the occasional copper fitting for valve stability).
Now, to spend this much time working on Faulkner!
Dan
Re: A Belated Merry Christmas
Posted: Tue Dec 31, 2013 4:05 pm
by Denver 59 Fin Convert
Faullkner can wait till tomorrow for the New Year to begin and to have you spend time with him...after your Honeymoon that is!